The installation process has four parts. Follow them in order unless a Neotech engineer has already completed one of the stages for your site.

Installation sections

Before you start

Confirm that you have:

  • A powered WisGate collector.
  • Access to the gateway network or Wi-Fi access point.
  • Access to the collector setup page.
  • The tiltmeter devices assigned to the project.
  • Site network details for dashboard or cloud connectivity.